Developer/Owner(s): Non-member Madison Marquette
Architecture Firm(s): Gensler
General Contractor(s): Bayley Construction
Broker Firm(s): Non-member Madison Marquette
Engineering Firm(s): Non-member MKA
Other Significant Team Member, if applicable: Daniel Meyers, Development Manager
Interior Architect/Designer Firm(s): Gensler
Construction/Project Manager Firm(s): Westlake Consultants
Bayley Construction
Consultant Firm(s): MKA - Structural
Site Workshop - Landscape Architecture
Fisher, Marantz, Stone - Lighting
Fortune, Shepler, Saling - vertical transportation
Major Sub/Vendor(s): CGI (Construction Group International) - Demolition
Apex Steel - Structural Steel
VECA Electric - Electrical
MacDonald Miller - Mechanical HVAC
TKE (Thyssen Krupp Elevator) - Vertical Transportation
Sessler Inc - Framer/drywall
Novum Structures - Structural Glass Entries
Synergi LLC - Glass guardrails
Northshore Sheet Metal - Sheet Metal
Baye Enterprises - Finished wood wall/ benches and stair
Flooring Solutions - Polished Concrete Floors
Quality Floors - Tile
Purcell Painting - Painting
Vertical Dimensions - Elevator Finishes
Snaptex - Decorative Ceilings
Habitat Horticulture - Green Column
Interior Tech - Fire Shutters
Facade Tech - Curved Glass Wall
Pacific Place Repositioning
Category
Redevelopment/Renovation of the Year
Description
Downtown Seattle has become a notably more vibrant destination since Pacific Place was built. With a vision to become a lifestyle destination and a unique gathering space for shoppers, visitors and the local community, Pacific Place has transformed and redefined retail. Dramatic new entrances attract attention and invite visitation, while the internal appearance has been refocused on the tenants. Better accessibility and a simplified atrium creates a fresh experience. It’s where Seattle comes to life.
Share