Developer/Owner(s): Non-member Virginia Mason Franciscan Health
Architecture Firm(s): NBBJ
General Contractor(s): The Rush Companies
Broker Firm(s):
Engineering Firm(s): Non-member KPFF Consulting Engineers
Other Significant Team Member, if applicable:
Interior Architect/Designer Firm(s):
Construction/Project Manager Firm(s):
Consultant Firm(s):
Major Sub/Vendor(s): Active Construction, Inc. (Earthwork)
Alliance Steel Fabrication (Structural Steel)
CHG Building Systems Inc. (Erector)
Designer Flooring Group (Flooring)
Diamond Structures, Inc. (Concrete)
Evergreen Refrigeration, LLC (HVAC)
General Sheet Metal (Exterior Envelope)
His Hands Lawn Care & Services (Landscaping)
Interior Wood Products LLC (Casework)
Kirby Electric, Inc. (Electric)
Level 5 Washington, Inc. (GWB)
Patriot Fire Protection Inc. (Fire Suppression)
Sabelhaus West Inc. (Painting)
Tacoma Plumbing & Heating, Inc (Plumbing)
St. Michael Medical Pavilion
Category
Community Impact Development of the Year
Description
The St. Michael Medical Pavilion is a 151,790 sq ft building built for Virginia Mason Franciscan Health. The building was designed to consolidate multiple specialty care practices, now part of Franciscan Medical Group, that were previously housed in aging buildings in the surrounding region. The St. Michael Medical Pavilion now serves as a modern, single facility to provide exceptional care to its patients and to fill a gap in the community.
Share