Developer: BioMed Realty
Architect: ZGF | Zimmer Gunsul Frasca Architects LLP
General Contractor: GLY Construction
Construction/Project Manager: OAC Services, Inc. Alisa Billbe, Project Manager
OAC Services, Inc.
abillbe@oacsvcs.com
Interior Architect/Designer: ZGF | Zimmer Gunsul Frasca Architects LLP
Broker: N/A
Consultants: Coughlin Porter Lundeen CPL Cont'd
Consultant Discipline: Structural and Civil
Reza Shafiei-Tehrany (Structural) RezaS@cplinc.com;
Jace Bovington (Civil) JaceB@cplinc.com
PAE Engineers
Consultant Discipline: Mechanical and Electrical
Dave Williams (Mechanical); dave.williams@pae-engineers.com,
Robert Smith (Electrical); robert.smith@pae-engineers.com
Lerch Bates
Consultant Discipline: Electrical Conveyance
Kevin Egli, Kevin.Egli@LerchBates.com
Mike Mutal, Mike.Mutal@LerchBates.com
AEI Affiliated Engineers
Consultant Discipline: Commissioning Agent
Jeremy Braithwaite jbraithwaite@aeieng.com
Wetherholt & Assoc.
Consultant Discipline: Waterproofing/Bldg Envelope
Ray Wetherholt; rayw@wetherholt.com
Spectrum
Consultant Discipline: AV Consultant
Lindsey McGill
lindsey@spectrumsd.com
Major Subs/Vendors: MacDonald Miller Facility Solutions McKinstry – HVAC/Plumbing
Mr. John Snell |
E-mail: johns@mchkinstry.com
Phone: 206.762.3311
SASCO – Electrical
Mr. TJ Porter |Senior Vice President
E-mail: tjporter@sasco.com
Phone: 425.806.8400
ThyssenKrupp Elevator AG – Elevator
Mr. Steve Sayre | Comm. Elevator Sales
E-mail: steve.sayre@thyssenkrupp.com
Phone: 425.828.3110
Anning-Johnson, Inc. – EIFS/Fireproof/GWB - 07240, 07253, 09250
Mr. Ryan Loyd | Project Manager
E-mail: rloyd@anningjohnson.com
Phone: 206.459.3649
Cobra Building Envelope Contractors – Roofing
Mr. Jim Davis | Project Manager
E-mail: jimd@cobraresults.com
Phone: 206.979.7600
Goldfinch Bros – Glass/Glazing
Mr. Javier Bonilla |Project Drafting Manager
E-mail: javierb@goldfinchbros.com
Phone: 425.258.4662
BioMed Realty / 500 Fairview - The VUE Research Center
Category
Technology/Life Science Development of the Year
Description
The new, ground-up, 172,000-square-foot life science building at 500 Fairview seamlessly connects to the neighboring 530 Fairview at all levels – including three levels of below-grade parking. In addition, during construction of 500 Fairview, the adjacent 530 Fairview was converted to a high-rise to match the new seven-story facility. Together, the two buildings make up the Vue Research Center. This rare type of buildout relied heavily on extensive collaboration between designers sharing 3D models, and participation in several Lean pull-planning sessions involving all team members, including subcontractors.
Building in a congested urban environment and integrating with an operational life science building required close coordination with neighboring occupants to reduce disruption to sensitive lab procedures. The team also used Lean strategies such as just-in-time deliveries to eliminate laydown/storage and increase efficiencies on the job site to benefit schedule, costs and the overall construction process. Vue Research Center is targeting LEED Silver.
Share